Call 08048604044 87% Response Rate

Send Email

Stud Welding Machine For Control Panels

Manufacturer of a wide range of products which include shear stud welding machine.
Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine
  • Shear Stud Welding Machine

Shear Stud Welding Machine

Product Price: Rs 5.3 Lakh / PieceGet Best Price

Minimum Order Quantity: 01 Piece

Product Brochure

Product Details:
Output Current500 A
Output Current (Ampere)1000
Usage/ApplicationIndustrial
Open Circuit Voltage80
Ground Cable10 MTR LONG
Net Weight100 KG
Welding Stud RangeUPTO 25 MM
Maximum KVA Rating165
The advantages of stud welding machine is welding strength which is more than the surrounding metal, no filler wire requires making it economical, production is very high, one-sided fastening gives ample space for designing, a semi-skilled person may operate the machine and cost of operation are reduced to the lowest.Stud welder is used in a process where a metal stud is welded by the heating process of the arc to the workpiece. There happens to be a strong one-sided welding on base metals of different thickness from 3 mm to 25 mm. This process is the most reliable method of fastening to any size and configuration of stud welded quickly to the workpiece and provides high welding penetration and stability. The welding set is 50% lighter in weight as compared to the transformer type, the energy consumption is half than the traditional machines, the efficiency degree is high as it is inverter technology.What we do in stud welding is put the positive pole of power source on the workpiece. The required stud inserted into the stud welding gun to a position on the workpiece may be with ceramic ferrule to position it. We can start the welding process by lifting the stud. When stud lifted the low arc or pilot arc is drawn. The main arc produces between workpiece and stud. The ampere is adjusted as per diameter and cross-sectional area. At the completion of welding time, the stud is directed toward the workpiece. Now turn off the power source thus welding zone is cool down and solidify.

Additional Information:

  • Production Capacity: 1
  • Delivery Time: ONE WEEK
  • Packaging Details: WOODEN BOX
Get Best QuoteRequest A Callback

EXPLORE MORE CATEGORIES

Contact Us
 
Thank youYour Enquiry has been sent successfully.
© D.H. Enterprises. All Rights Reserved (Terms of Use)Developed and managed by IndiaMART InterMESH Ltd.